Neophytos Zavrides wrote:
Upgrade of Tombs of the Kings Avenue will provide for a full dual carriageway with ‘respect’ to the adjacent developments.
A full cycle way will be to the south side and a round-about will be constructed at the way to the Tombs of the Kings site, three parking areas will be included as well.
The typical cross-section is the one of the Ayion Anargyron Avenue.
Design period is approximately 2 years starting July 2005, that means construction works will start end of 2007 as an optimistic scenario.
Neophytos Zavrides wrote:
Upgrade of Tombs of the Kings Avenue will provide for a full dual carriageway with ‘respect’ to the adjacent developments.
Neophytos Zavrides wrote: A full cycle way will be to the south side and a round-about will be constructed at the way to the Tombs of the Kings site, three parking areas will be included as well.
Neophytos Zavrides wrote:The typical cross-section is the one of the Ayion Anargyron Avenue.
Neophytos Zavrides wrote:Design period is approximately 2 years starting July 2005, that means construction works will start end of 2007 as an optimistic scenario.
Users browsing this forum: No registered users and 2 guests