repulsewarrior wrote:http://cyprusscene.com/2015/04/24/project-of-the-century-turkish-water-coming-to-northern-cyprus/
...finally something more comprehensive as news.
A project Manager who does not even speak English and needs an interpreter where did he get all his knowledge in Turkey, a damn whose capacity they carefully hide, a dam who doesn't look bigger than the Kionelli damn, a dam that will presumably get filled up 2-3 times per year (FILLED UP??- I thought it would always be full).
A damn that by the announced flow rates should get full within 2 maximum 5 days....
A 5MW pumping station at a time the maximum capacity of their turbines in the occupied is 80MW and they have numerous power cuts....
Surely the Turks are the No1 masters in lies.