rajput49 wrote:ELECTRICTY isnt a problem developer should arrange for u temporary electricity by the time electricity authority comes in do inspection and put electricity its a normal practice same is the case with water if ur developer has asked u come in cyprus he must arrange temprory electricity.electrician of the developer will arrange this but only drawback is that u wouldnt be able to run a/c or oven etc.it will be ok for lights and sockets etc. because of the amperes u will get wouldnt be enough to take load of many appliances.hope u got what to do.